Need help with Joomla? We are available for hire to help with Joomla customization, upgrades, maintenance, and custom development.
Explore our services

How to change ordering of items in EShop

  • Giang Dinh Truong
  • Topic Author
  • Offline
  • Administrator
  • Administrator
More
12 years 2 months ago #49278 by Giang Dinh Truong
How to change ordering of items in EShop was created by Giang Dinh Truong
To be able to change ordering of items in EShop, you need to click on header of order column to active it first (look at attached image). After that, you will be able to change ordering of items by:

1. Clicking on Up or Down icons
2. Entering the ordering value in each text box and click on Save icon in the header of order column to save.

Sincerely, Giang
The following user(s) said Thank You: Dave B, Vickie Bowden

Please Log in or Create an account to join the conversation.

More
11 years 3 months ago #66574 by Alfonso Buenrostro
Replied by Alfonso Buenrostro on topic How to change ordering of items in EShop
I already test the solution and everithing is working well
Thank you very much for your help and support
You can close this ticket
Regards

Please Log in or Create an account to join the conversation.

  • Giang Dinh Truong
  • Topic Author
  • Offline
  • Administrator
  • Administrator
More
11 years 3 months ago #66609 by Giang Dinh Truong
Replied by Giang Dinh Truong on topic How to change ordering of items in EShop
That's fine Alfonso!
Sincerely, Giang

Please Log in or Create an account to join the conversation.

More
9 years 6 months ago - 9 years 6 months ago #98757 by sarah
Replied by sarah on topic How to change ordering of items in EShop
This does not always work. I realize sorting/ordering only works when you are looking at ALL of the products. If I sort by category, for example, show all items from category #1, CBA, I cannot resort to ABC, unless i look at all items in all categories in which case I have to sort through hundreds of items from various categories. Very cumbersome and not practical. Am I missing something here?
Last edit: 9 years 6 months ago by sarah.

Please Log in or Create an account to join the conversation.

More
9 years 6 months ago #98760 by Tim Smith
Replied by Tim Smith on topic How to change ordering of items in EShop
We have a similar issue. We have EShop ver 2.5.5 & Joomla 3.7.1 .

Under Catalog>Products I can sort by the product ID column, but there is not an Order column as with earlier versions (see attached screen shot). I checked the online manual, it also shows an Order column as well.

How do I change the order of products now?

Please Log in or Create an account to join the conversation.

More
9 years 6 months ago #98768 by sarah
Replied by sarah on topic How to change ordering of items in EShop
Based on the image you've attached, you can click on the far left top icon (up/down triangles) which will turn the three grey dots to the left of the line items, black and allow you to sort by clicking on those dots and dragging. Thats a joomla style feature, rather than a component feature. I think I'll upgrade now that I see how the newer version works....

Please Log in or Create an account to join the conversation.

  • Giang Dinh Truong
  • Topic Author
  • Offline
  • Administrator
  • Administrator
More
9 years 6 months ago #98769 by Giang Dinh Truong
Replied by Giang Dinh Truong on topic How to change ordering of items in EShop
Dear all,

My guide here was for very old version of EShop. In the newer version, EShop has order/sort options work as Joomla 3.x standard. So you just need to active the order column, then you can drag/drop items to change their order.

@Sarah: Please update EShop to the latest version 2.5.5 so you will see.

Sincerely, Giang

Please Log in or Create an account to join the conversation.

Moderators: Giang Dinh Truong