Need help with Joomla? We are available for hire to help with Joomla customization, upgrades, maintenance, and custom development.
Explore our services How to change ordering of items in EShop
- Giang Dinh Truong
-
Topic Author
- Offline
- Administrator
-
Less
More
12 years 1 month ago #49278
by Giang Dinh Truong
How to change ordering of items in EShop was created by Giang Dinh Truong
To be able to change ordering of items in EShop, you need to click on header of order column to active it first (look at attached image). After that, you will be able to change ordering of items by:
1. Clicking on Up or Down icons
2. Entering the ordering value in each text box and click on Save icon in the header of order column to save.
Sincerely, Giang
1. Clicking on Up or Down icons
2. Entering the ordering value in each text box and click on Save icon in the header of order column to save.
Sincerely, Giang
The following user(s) said Thank You: Dave B, Vickie Bowden
Please Log in or Create an account to join the conversation.
- Alfonso Buenrostro
- Offline
- New Member
-
Less
More
- Posts: 1
- Thank you received: 0
11 years 2 months ago #66574
by Alfonso Buenrostro
Replied by Alfonso Buenrostro on topic How to change ordering of items in EShop
I already test the solution and everithing is working well
Thank you very much for your help and support
You can close this ticket
Regards
Thank you very much for your help and support
You can close this ticket
Regards
Please Log in or Create an account to join the conversation.
- Giang Dinh Truong
-
Topic Author
- Offline
- Administrator
-
11 years 2 months ago #66609
by Giang Dinh Truong
Replied by Giang Dinh Truong on topic How to change ordering of items in EShop
That's fine Alfonso!
Sincerely, Giang
Sincerely, Giang
Please Log in or Create an account to join the conversation.
- sarah
-
- Offline
- New Member
-
Less
More
- Posts: 7
- Thank you received: 0
9 years 4 months ago - 9 years 4 months ago #98757
by sarah
Replied by sarah on topic How to change ordering of items in EShop
This does not always work. I realize sorting/ordering only works when you are looking at ALL of the products. If I sort by category, for example, show all items from category #1, CBA, I cannot resort to ABC, unless i look at all items in all categories in which case I have to sort through hundreds of items from various categories. Very cumbersome and not practical. Am I missing something here?
Last edit: 9 years 4 months ago by sarah.
Please Log in or Create an account to join the conversation.
- Tim Smith
- Offline
- New Member
-
Less
More
- Posts: 17
- Thank you received: 0
9 years 4 months ago #98760
by Tim Smith
Replied by Tim Smith on topic How to change ordering of items in EShop
We have a similar issue. We have EShop ver 2.5.5 & Joomla 3.7.1 .
Under Catalog>Products I can sort by the product ID column, but there is not an Order column as with earlier versions (see attached screen shot). I checked the online manual, it also shows an Order column as well.
How do I change the order of products now?
Under Catalog>Products I can sort by the product ID column, but there is not an Order column as with earlier versions (see attached screen shot). I checked the online manual, it also shows an Order column as well.
How do I change the order of products now?
Please Log in or Create an account to join the conversation.
- sarah
-
- Offline
- New Member
-
Less
More
- Posts: 7
- Thank you received: 0
9 years 4 months ago #98768
by sarah
Replied by sarah on topic How to change ordering of items in EShop
Based on the image you've attached, you can click on the far left top icon (up/down triangles) which will turn the three grey dots to the left of the line items, black and allow you to sort by clicking on those dots and dragging. Thats a joomla style feature, rather than a component feature. I think I'll upgrade now that I see how the newer version works....
Please Log in or Create an account to join the conversation.
- Giang Dinh Truong
-
Topic Author
- Offline
- Administrator
-
9 years 4 months ago #98769
by Giang Dinh Truong
Replied by Giang Dinh Truong on topic How to change ordering of items in EShop
Dear all,
My guide here was for very old version of EShop. In the newer version, EShop has order/sort options work as Joomla 3.x standard. So you just need to active the order column, then you can drag/drop items to change their order.
@Sarah: Please update EShop to the latest version 2.5.5 so you will see.
Sincerely, Giang
My guide here was for very old version of EShop. In the newer version, EShop has order/sort options work as Joomla 3.x standard. So you just need to active the order column, then you can drag/drop items to change their order.
@Sarah: Please update EShop to the latest version 2.5.5 so you will see.
Sincerely, Giang
Please Log in or Create an account to join the conversation.
Moderators: Giang Dinh Truong
Support
Documentation
Information
Copyright © 2026 Joomla Extensions by Joomdonation. All Rights Reserved.
joomdonation.com is not affiliated with or endorsed by the Joomla! Project or Open Source Matters.
The Joomla! name and logo is used under a limited license granted by Open Source Matters the trademark holder in the United States and other countries.
The Joomla! name and logo is used under a limited license granted by Open Source Matters the trademark holder in the United States and other countries.